Ziyun Bridge is the third bridge across the Ganjiang River in Fengcheng City, Yichun, Jiangxi Pr<ovince. The total length of the project is 8.6 kilometers and the length of the bridge is 5,®126 kilometers. It is expected to be completed in 2024. The pr₩oject volume is large and the construction period is urgent.γ
The pile foundation support on the north bank of the Ganjiang River ad←opts Doosan DX500 excavator and the S650 pile driver produced by our company for constr←uction.During the construction period in July, the local area continued to be hot, with an ave♥rage outdoor temperature of 38 degrees Celsius, and the surface temperature of the fuselage of th e pile driver under the sun was close to 70 degrees Celsiu€s. The average daily working time of the Juxiang pile driver was more∑ than 10 hours. The temperature was not too high during the entire 'construction period, and the steel plate pile support construction task was Ωcompleted on time and with quality assurance.
Juxiang S650 pile driver has an excitation force of γ65 tons and a rotation speed of 2700 per minute. It has a unique patente$d heat dissipation design. It has the advantages of stable work, low noise and no" high temperature. The soil quality of the pile foundatio✘n site on the north bank of the Ganjiang River of Ziyun Bridge is the upper si★lted sandbar and the lower gravel riverbed. The geology and water content are✘ large. The average time for 9 Milason steel plate piles is about♣ 30 seconds, and the driver can meet the piling intensity by using first-level viΩbration throughout the process.During this construction, the excellent work pe<rformance of Juxiang pile driver was praised by the construction party and Party A.
Juxiang Construction Machinery
Address: No. 208, Fenghuangshan Road, Fushan District, Yantai City, Shandong Province
Tel: 086-535-2130397
Mobile: 086-13325153723 (WeChat)